Today,TKCE Consulting Engineers has an outstanding track record in the cruise, yacht and ferry sector, having consistently demonstrated its unbeatable combination of reliable, accurate & punctual design and professional management of follow-up build projects.
Owner: Arcalia Shipping Line
Shipyard: Perama Shipyards – Greece, Conversion
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 170 m
Pax.: 750
Owner: Regency Cruises
Shipyard: Avlis Shipyards – Greece, Conversion
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 136 m
Pax.: 600
Owner: -
Shipyard: Avlis Shipyards – Greece, Conversion
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 120 m
Pax.: 450
Owner: Regency Cruises
Shipyard: Avlis Shipyards – Greece, Conversion
Date: 1992-1993
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 184 m
Pax.: 1.000
Owner: -
Shipyard: Perama Shipyards – Greece, Conversion
Project: Design of the complete A/C System.
L.O.A.: 115 m
Pax.: 250
Owner: Orient Lines
Shipyard: Perama Shipyards – Greece, Conversion
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 176 m
Pax.: 915
Owner: Regency Cruises
Shipyard: Perama Shipyards – Greece, Conversion
Date: 1993-1994
Project: Design of the complete A/C System. Management of the project and commissioning.
L.O.A.: 135 m
Pax.: 620
Owner: Royal Caribbean Cruise Line
Shipyard: Kvaerner Masa Yard – Finland, New Building 492
Project: A/C design and production of corresponding drawings for 10 Public spaces. Revision and completion of basic design drawings for A/C System, all spaces M.F.Z. 3 and 4.
L.O.A.: 284m
Pax.: 2.000
Owner: Tony Travel (Regency Cruises)
Shipyard: Avlis Shipyards – Greece. New Building (not completed)
Date : 1993/1994
Project: Preliminary design for the complete A/C System, issuing of specifications.
L.O.A. : 222 m
Pax. : 1.400
Owner: Princess Cruises
Shipyard: Fincantieri Monfalcone – Italy, New Building 5956
Project: Design for the A/C System - M.F.Zones 2, 4 and 6 (electrical systems excluded). Support in the engineering management for the complete ship. Support in the commissioning and delivery of the system.
L.O.A.: 285 m
Pax.: over 2.600
Owner: Princess Cruises
Shipyard: Fincantieri Monfalcone – Italy, New Building 5958
Project: Complete design of the A/C System, based on Type Ship, (electrical systems excluded). Engineering Management for the complete system.
L.O.A.: 261 m
Pax., crew: over 2.000
Owner: Andaman & Nicobar Administration
Shipyard: Hindustan Shipyards Ltd. – India, New Building 11101
Date: 1996-1997
Project: Complete design of the A/C and Ventilation System under the management of Harland and Wolff, Belfast.
L.O.A.: 160 m
Pax.: 1.200
Owner: Carnival Cruise Lines
Shipyard: Fincantieri Monfalcone – Italy, New Building 5979
Date: 1997-1998
Project: Complete design of the A/C System (electrical systems excluded). Project management for the complete A/C System. Commissioning and delivery to the owners.
L.O.A.: 272 m
Pax.: 2.758
Owner: Holland America
Shipyard: Fincantieri Marghera – Italy, New Building 6035
Project: Extensive participation in the design of a prototype Fan Coil Unit for installation in cabins. Complete design of the A/C System (electrical systems excluded) by the use of Fan Coil Units for all Passenger and Crew cabins. Project management for the complete A/C System. Commissioning and delivery to the owners.
Pax.: over 1.800
Owner: Arcalia Cruise Line (Ex Danae, Ex Therissos Express)
Shipyard: Lisboa – Portugal, Conversion.
Date: 2005
Project: Design of the A/C system for a number of areas.
L.O.A.: 162 m
Pax.: 6570
Owner: P&O Cruises
Shipyard: Meyer Werft – Germany, New Building 640
Date: 1998
Project: Design of the A/C System for M.F.Zones 1, 4, 6 and 7. Engineering management for the complete A/C System.
L.O.A.: 260 m
Pax.: 1.975
Owner: South Pacific Cruise
Shipyard: Mitsubishi Heavy Industries – Japan, Conversion
Project: Design of the A/C system for a small number of areas to be converted.
L.O.A.: 193 m
Pax.: 604
Owner: Celebrity Cruises
Shipyard: Chantiers De L’ Atlantique – France, New Building R31
Date: 1998-1999
Project: Production of Good For Approval One Line Drawings and support to the designing team for the production of Good For Use One Line Drawings.
L.O.A.: 210 m
Pax.: 1.700
Owner: Carnival Cruise Lines
Shipyard: Fincantieri Monfalcone – Italy, New Building 6045 (sister ship to 5979)
Project: Complete design of the A/C System (electrical systems excluded). Project management for the complete A/C System. Commissioning and delivery to the owners.
L.O.A.: 272 m
Pax.: 2.758
Owner: Holland America
Shipyard: Fincantieri Marghera – Italy, New Building 6036 (sister ship to 6035)
Project: Complete design of the A/C System (electrical systems excluded) by the use of Fan Coil Units for all Passenger and Crew cabins. Project management for the complete A/C System. Commissioning and delivery to the owners.
L.O.A.: 237 m
Pax.: over 1.800
Owner: Holland America
Shipyard: Fincantieri Marghera – Italy, New Building 6052 (sister ship to 6035, 6036)
Date: 1999-2000
Project: Complete design of the A/C System (electrical systems excluded) by the use of Fan Coil Units for all Passenger and Crew cabins. Project management for the complete A/C System. Commissioning and delivery to the owners.
L.O.A.: 237 m
Pax.: over 1.800
Owner: Princess cruises
Shipyard: Fincantieri Monfalcone – Italy, New Building 6050
Date: 2001
Project: Complete design of the A/C System (electrical systems excluded). Project engineering for the complete A/C System.
L.O.A.: 285 m
Pax.: over 2.600
Owner: Princess cruises
Shipyard: Fincantieri Monfalcone – Italy, New Building 6051
Project: Complete design of the A/C System (electrical systems excluded). Project engineering for the complete A/C System.
L.O.A.: 285 m
Pax.: over 2.600
Owner: Arcalia Cruise Line (ex.Astra)
Shipyard: Lisboa – Portugal, Conversion
Project: Design of the A/C System.
L.O.A.: 117 m
Pax.: over 282
Owner: Mano Maritime
Shipyard: Perama Shipyards – Greece, Conversion
Date: 2000-2001
Project: Design of the A/C System for new and modified areas. Approval of drawings by the Authorities and Classification Societies. Upgrading of the existing A/C and Ventilation System in order to meet the SOLAS Requirements.
L.O.A.: 137.10 m
Owner: Mano Maritime
Shipyard: Perama Shipyards – Greece, Conversion.
Date: 2002
Project: Design of the A/C System for new and modified areas. Approval of drawings by the Authorities and Classification Societies. Upgrading of the existing A/C and Ventilation System in order to meet the SOLAS Requirements.
L.O.A.: 137.10 m
Owner: Norwegian Cruise Lines.
Date: 2004-2005
Project: Survey of the A/C & Ventilation System for the Laundry area, technical spaces and one public space. Submission of respective report for upgrading the A/C & Ventilation System. Preliminary design. Submission of respective proposals for upgrading the A/C & Ventilation System.
Owner: Discovery world cruises
Date: 2003
Project: Design of A/C System for conversion of modified areas, supplying the air handling machinery (AHUs, FCUs) etc., construction, management and supervision.
Owner : Sete S.A.
Date: 2003
Project : Design of new HVAC System for conversion from cruise ship to mega yacht, issuing of specifications for the machinery.
Shipyard: Meyer Werft – Germany, New Building 659
Date: 2006-2007
Project: Production of Foundation, Penetration, Co-ordination and Control drawings for A/C Stations (Fan Rooms) and trunks for the HVAC System, both on Site and in Athens.
L.O.A.: 252 m
Pax.: 2050
Shipyard: Meyer Werft – Germany, New Building 666
Date: 2007-2008
Project: Production of Foundation, Penetration, Co-ordination and Control drawings for A/C Stations (Fan Rooms) and trunks for the HVAC System, both on Site and in Athens.
L.O.A.: 252 m
Pax.: 2050
Shipyard: Meyer Werft – Germany, New Building 660
Date: 2008-2009
Project: Production of Foundation, Penetration, Co-ordination and Control drawings for A/C Stations (Fan Rooms) and trunks for the HVAC System, both on Site and in Athens.
L.O.A.: 252 m
Pax.: 2050
Shipyard: Meyer Werft – Germany, New Building 680. Date: 2009
Project: Production of Foundation, Penetration, Co-ordination and Control drawings for A/C Stations (Fan Rooms) and trunks for the HVAC System, both on Site and in Athens.
L.O.A.: 252 m.
Pax.: 2050
Owner: Mystic Cruises
Shipyard: Viana Shipyard, Portugal.
Date: 2017-2020
Project:Complete design of the A/C System (including Heating and Cooling load calculations, Single line diagrams, Chilled & Hot water drawings, relevant Pressure & Sound calculations, Electrical & Control drawings, A/C equipment procurement etc.)Penetration drawings, Co-ordination drawings for A/C Stations (Fan Rooms) and trunks.
L.O.A.: 125 m.
Pax.: 196 - 200
Contractor : VARD Accommodation AS, Νorway.
Date: 2019-2020
Project:Ice Water system Single line drawings and calculations.
Shipyard: Split – Croatia, Conversion
Date: 2000-2001
Project: Design of new HVAC System for an extensive conversion, issuing of specifications for the machinery, management of the project,submission of drawings to the Authorities and Classification Societies approvals.
L.O.A.: 99 m
Shipyard : Hephaestus Hellas Shipyards S.A. – Greece
Project : Upgrading (designing and contracting) of the Automation System for the A/C plant.
L.O.A. : 99 m
Owner: SETE S.A (project name Triton)
Shipyard: Greece
Date: 2001
Project: Support to the owners for issuing specification for the A/C System. Auditing of the complete design for the Ventilation and A/C System. Construction, survey and submission of respective report.
L.O.A.: 99 m
Owner: -
Shipyard: -
Project: Preliminary design for the A/C System.
L.O.A.: 90 m
Owner: Alpha marine
Shipyard: Perama Shipyards – Greece, Conversion. Date: 2002
Project: L.O.A.: 50 m Design of a new HVAC System
Shipyard: Piraeus – Greece
L.O.A.: 100 m Survey of the A/C System. Submission of respective report for upgrading the HVAC System.
Owner: Sea Charter Co.
Shipyard: Cantiere Navale De Poli S.p.A. – Italy
Project: Not numbered new-building.
L.O.A.: 71 m Basic design for the A/C and Ventilation System
Owner: Liveras Yachts
Shipyard: Neorion Shipyards – Greece, New Building 1101. Date: 2001-2002-2003
Project:L.O.A.: 85.3 m Complete design for the A/C and Ventilation System. Issuing of the corresponding specifications for the air handling machinery etc. Management, supervising and commissioning of the complete HVAC system.
Owner: Liveras Yachts
Shipyard: Neorion Shipyards – Greece, New Building 1102. Date: 2003-2004-2005
Project: L.O.A.: 85.3 m Complete design for the A/C and Ventilation System. Issuing of the corresponding specifications for the air handling machinery etc. Management, supervising and commissioning of the complete HVAC system.
Shipyard: Piraeus – Greece
L.O.A.: 60 m
Survey of the A/C System. Submission of respective report for upgrading the HVAC System. Design of a completely new HVAC system.Issuing of the corresponding specifications for the air handling machinery etc.Management and supervising of the complete HVAC system.
Shipyard : Piraeus – Greece.
Date: 2008
L.O.A.: 50 m.
Design of HVAC System , Heat - load calculations, Single line diagrams. Submission of drawings to the Authorities and classification Societies approvals.
Owner: Alpha marine
Shipyard: Piraeus – Greece. Date: 2008
L.O.A.: 97.3 m.
Complete design for the A/C and Ventilation System. Heat Load calculations, One Line Diagram,Electric Load and PowerAnalysis, Issuing of the corresponding specifications for the air handling machinery.
Owner: Alpha marine
Shipyard: Piraeus – Greece.
Date: 2008
L.O.A.: 57 m.
Complete design for the A/C and Ventilation System. Heat-load calculations, One Line Diagram, Electric Load and Power Analysis. Issuing of the corresponding specifications for the air handling machinery.
Shipyard: Piraeus – Greece.
Date: 2009
Project :L.O.A.: 50 m. Design of HVAC System , Heat - load calculations, Single line diagrams. Submission of drawings to the Authorities and Classification Societies approvals.
Shipyard: Perama Shipyards – Greece, New Building.
Date: 1999
Project: Design, contracting and commissioning of the complete A/C and Ventilation systems.
Shipyard : Perama Shipyards – Greece, New Building
Date :2001-2002
Project : Design, contracting and commissioning of the complete A/C and Ventilation systems.
Shipyard: Kvaener Masa Yard – Finland, New Buildings
Date: 2003
Project: Support to the owners for the revision of the specification for the A/C System. Auditing of the complete design for the A/C System. Correction and submission of “Good for Approval” drawings to the Authorities.
Shipyard: HDW – Germany, New Buildings.
Date: 2003
Project: Support to the owners for the issuing the specification for the A/C System. Auditing of the complete design for the ventilation and A/C System. Correction and submission of “Good for Approval” drawings to the Authorities.
Shipyard: Daewoo – Korea, New Buildings 7507, 7508
Project: Auditing of the complete design for the A/C System
Shipyard : Daewoo – Korea, New Buildings 7507, 7508.
Date: 2002-2003
Project : HVAC System conversion of cabin areas in deck 7. Issuing of specifications for the air handling machinery, etc.
Shipyard : Elefsis Shipyards – Greece New building HN16001 & 16002 . Date: 2008-2009
Project :Complete piping arrangement (including fuel oil, lub oil, bilge, ballast, fire, sea water, fresh water, sewage, gray water, air vent, sounding, overflow, chilled and hot water.)Engine room layout, As fitted drawings.
Contractor: Wilhelmsen Marine Engineering.
Date: 2014
Project : Basic design of HVAC system. Cooling and heating loads calculations, Single line diagrams, modeling of duct system in MagiCAD, Pressure drop & Sound calculations, MTO lists.
Various detailed calculations. Equipment specification.
.
Contractor: Wilhelmsen Marine Engineering
Owner: ConocoPhillips
Date: 2010-2013
Project: Basic design of HVAC system, Heating Cooling Load Calculations, D&IDs, Single Line diagrams, duct model in MagiCAD software, MTO lists, Pressure drop / sound calculations.
Detailed design. Participation in management and supervision of the erection on site.
Contractor: Wilhelmsen Marine Engineering
Owner: Odfjell Drilling
Date: 2012
Project: Modeling of duct system in MagiCAD. Pressure drop & Sound calculations.
Contractor: Wilhelmsen Marine Engineering
Date: 2012
Project: Modeling of duct system in MagiCAD. D&ID diagrams.
Owner: Hellenic Navy
Shipyard: Elefsis Shipyards
Project: Serving as consultants to the yard for various HVAC system issues.Survey, airflow measurements. Design. Issuing of specifications of necessary machinery. Supervision of works for the upgrading of the existing A/C and Ventilation System. Production of “as fitted” drawings.
Owner: Hellenic Navy
Shipyard: Elefsis Shipyards
Project: Hellenic Navy Fast Attack Crafts.Serving as consultants to the yard for various HVAC system issues. Auditing of the design of the A/C System and respective summer tests.Airflow measurements.
Owner: Brazil Petrobras
Project : Complete basic design for the A/C & Ventilation system, including all accommodation spaces, technical and electrical spaces, stores, workshops etc.Issuing of specifications for the air handling machinery etc.
Owner: LNG FPSO Project :Complete basic design for the A/C & Ventilation system, including all accommodation spaces, technical and electrical spaces, etc.
Owner: Livestock Carrier
Shipyard: Lamda Shipyards – Greece.
Date: 2004
Project: Complete basic design for the A/C & Ventilation system, issuing of specifications for the air handling machinery etc.
Owner: Halton Marine.
Date: 2004
Project: Energy Calculations for a Marine A/C System Production of the model of a Marine A/C System for accommodation areas, defining the various factors influencing the efficiency of the system creating a suitable algorithm for determining the efficiency, evaluation of the results.
Owner: Carrier
Shipyard: Elefsis Shipyards – Greece
Project: Participation in the design of a prototype system for passenger vessels.
Owner: Halton Marine Date.
Date: 2006
Project: Calculation of energy consumption and energy savings for an A/C system where low radiation glazing panels are replacing the ordinary one and the air system is using low temperature supply air.
Owner: Hellenic Navy
Shipyard: Elefsis Shipyards – Greece.
Date: 2005
Project: General Support and Replenishment Ship) Heat load calculation for several spaces due to poor performance of the A/C system.Detailed calculations for main engines’ air inlet systems due to serious deformation of the existing ducts.
Owner: Hellenic Navy
Date: 2007
Project: (Lighthouse tender ship) Design of A/C System and issuing of specifications for the conversion of the system.
Shipyard: Wilhelmsen Marine Engineering.
Date: 2008-2009
Project : Complete design of A/C system for the accommodation area including good for construction drawings, specification of the machinery etc.Complete AV / AC electrical drawings including panel layout, logic diagrams, software development, Factory acceptance tests (FAT).
(Athens – Greece)
Design of new HVAC System for an extensive conversion including: Heating and cooling load calculations.Production of all drawings submitted to the authorities for approval Production of all construction drawings (air ducts for supply and exhaust systems, chilled and hot water piping systems, machinery arrangement in the fan rooms etc.) Calculation of the technical characteristics and issuing of the specifications for the air machinery and accessories. Project management: Supervising contractors, participating in meetings.
(Athens Airport – Greece)
Survey of the A/C System, balancing and commissioning of the system, submission of respective report.
(Athens – Greece)
Survey of the A/C System, balancing and commissioning of the system, submission of respective report.
(Athens – Greece)
Survey of the A/C System, balancing and commissioning of the system, submission of respective report.
(Souda Bay, Crete – Greece)
Survey of the A/C System, balancing and commissioning of the system, submission of respective report.